Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: ['j/x <br /> Complete the followin checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> VYe- 0 <br /> ❑ No* Is the visual alarm operational? <br /> E3 No* Were all sensors visuallyins functionall tested,and confirmed operational? <br /> No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper o ration? - . <br /> 0 Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> )iD N/A operational? <br /> Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply)A Sump/Trench Sensors; aDrspenser Containment Sensors. <br /> LDid you confirm sitive shut-down due to leaks and sensor failure/disconnection?,&Yes; ❑No. <br /> 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and o ratin ro rl ? If so,at what nt of tank ca aci does the alarm tri er? % <br /> No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all re lacement in Section E,below. <br /> No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If es,describe causes in Section E,below. <br /> ❑ No* Was monitorin s stem set- reviewed to ensure ro r settin s?Attach set u rerts,if a hcable <br /> ❑ No* Is all monitoripZ Mui2rnento tional Mr manufacturer's ifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected <br /> E. Comments: <br /> Page 2 of 3 03101 <br />