Laserfiche WebLink
i <br /> These are EHD CONDITIONS for the proposed work. <br /> 1 All deviations from the approved permit must be approved by EHD prior to <br /> implementation. <br /> 2 All equipment to be installed must be compatible with product to be stored in it. <br /> 3 EHD requires that all equipment to be installed must be UL listed. <br /> 4 Dispenser pans must be tested at the end of installation. <br /> 5 All lines connecting to the new equipment must be pressure tested at the end of <br /> installation. Precision test required at the end of installation. <br /> 6 Call 48 hours in advance for inspections. <br />