My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 10:12:50 AM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.9. Piping (cross-sectionat diagram, including connections to tank and dispensers). <br />(A) Vent and tank riser primeontainment system equipped with overfillovention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br />(8) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements <br />Primary piping in contact with hazardous substance under normal operation conditions shall be: <br />installed inside a secondary containment system in the form of: secondary pipe_Vault or <br />_lined trench to be sloped to a collection sump at the tow point of the piping. <br />Primary piping and secondary contai t systems will be installed in accordance with industry <br />code of practice and volunta c n us standards.. <br />Lined trench used as se co a c t nment <br />Material a with the substance stored. <br />Covered pable of supporting any expected vehicular traffic. <br />(F) Underground piping with seco r c tainment will be equipped and monitored as follows: <br />Secondary c nta nment will be equipped with a continuous monitoring system connected to an audible <br />and visual a a m system. <br />Automatic line leak detectors will be installed on pressurized piping <br />M facturer: Model: <br />A ual monitoring will be conducted on the pressurized piping with secondary containment. <br />A ual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State WaResources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />23. Total number of tanks an site after installation: <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner operator not acknowledge this responsibility for workplan ubmittal by signature and date below. <br />Name V Vir�/� Title Date <br />CONDITIONS OF APPROVAL: <br />
The URL can be used to link to this page
Your browser does not support the video tag.