My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 10:12:50 AM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3_n, 917�;Cy� �� <br /> 1 <br /> \10NITORING SYSTEM CERTIFICATION <br /> For'Use By All Jurisdictions Within the State of California <br /> Awhorir), Cited: Chapter(;.i, Health and Safer),Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment.A separate certification or report must be prepared <br /> for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br /> system owner/operator. The owner/operator most submit a copy of this form to the local agency regulating UST systems within 30 <br /> days of test date. <br /> A. General Inform do <br /> Facility Name: �J ak <br /> a Bldg.No.: <br /> e <br /> Site Address: �t 1 c�.� '1 L- tre e— `,� City: Zip: a' c <br /> Facility Contact Person: dw n eKContact Phone No.: (�) 3ccj'T -5 <br /> Mike/Model of Monitoring System: G2}>grw, E vy)C- Date of Testing/Servicing: / 9q/C)!:) <br /> B. Inventory of Equipment Tested/Certified <br /> Check thea ro riate boxe<to indicate s ecific. tri mens inspected/serviced: <br /> Tank ID: Tank ID: <br /> In-Tank Gauging Probe. Model: hl * In-Tank Gauging Probe. Model:M <br /> Annular Space or Vault Sensor. Model: (51 Annular Spacc or Vault Sensor. Model: <br /> Piping Sump/Trench Sensor(s). Model: O Piping Sump/Trench Sensor(s). Model: <br /> Fill Sump Scnsor(s). Model. '31-07 <br /> , 0 19 Fill Sump Sensor(s)t Model: <br /> C�Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model: Ln <br /> O Electronic Line Leak Detector. Model: _ ❑ Electronic Line.Leak Detector. Model: <br /> Ot Tank Overfill/High-Level Sensor. Model: Tank Overfill/High-Leve]Sensor. Model: V <br /> O Other(specify equipment type and model in Section E on Page 2). Other(specify equipment type and model in Section E on Pae 2). <br /> Tank ID: Tank ID- <br /> In-Tank Gauging Probe. Model: ^ ❑ In-Tank Gauging Probe. Model: <br /> Annular Space or Vault�ensor. Model: `j ❑ Annular Space or Vault Sensor. Model: <br /> O Piping Sump/Trench Sensor(s). Model: ❑ Piping Sump/Trench Sensor(s). Model: <br /> tkFill Sump Sensor(s). Model: a ❑ Fill Sump Sensor(s). Mode]: <br /> .-Mechanical Line Leak Detector. Model: 1–V CkrjC_e� O Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> Tank Overfill/High-Level Sensor. Model:t 1/✓ O Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(s fv eoui ment type and model in Section E on Pa e 2). ❑ Other(s cify eouipment type and model in Section E on Pae 2). <br /> Dispenser ID:� Dispenser ID: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> Shear Valve(s). ❑ Shear Valve(s). <br /> Dispenser Containm ni Float(s)and Chain(s). O Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> O Dispenser Containment Sensor(s). Model: O Dispenser Containment Sensor(s). Model: <br /> 1�0t, Shear Valve(s). ❑ Shear Valve(s). <br /> Dispenser Containment Floats)and Chain(s). O Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> O Shear Valve(s).' O Shear Valve(s). <br /> ❑Dis enser Containment Floats)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ']f the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification -l certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers' checklist) necessary to verify that this information.is <br /> correct.and a Plot Plan showing the layout of monitoring equipment. For any a uipmem capable of generating such reports;l have also <br /> attached a copy of the rejori;(check all that apply : System set-up Alarm history re ort <br /> Technician Name(print): A)rn I6C`S Signature: V <br /> Certification No.: Q)05 � License.No.: Q17,59) 1 <br /> Testing Company Naame1: ArmP�k� ��V\f-GV`M7dA L Phone No.:( gid � 2��� '7�f�►C'l, <br /> Site Address: 1�r7t I Cliee'1�(� ee Date of Testing/Servicing: <br /> Page 1 of 3 03/01 <br /> Monitoring Svstem Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.