Laserfiche WebLink
WRITTEN PROCEDURES &BEST MANAGEMENT PRACTICES <br /> FOR MONITORING <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> Quik Stop Market#152 <br /> 1721-1 South Cherokee Lane <br /> Lodi,California 95240 <br /> The gasoline storage and dispensing system at this location consists of two(2) 10,000 gallon and <br /> one(1) 8,000 gallon double-wall fiberglass,dry interstitial,underground storage tanks serving <br /> two(2)double-sided multi-product dispensers(MPDS). Product lines are double-wall fiberglass. <br /> A. Annular space of tanks and product lines are monitored continuously by electronic <br /> probes. Dispenser pans have float mechanisms that trigger shear valve shut-off. <br /> B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br /> Leak conditions trigger visual and audible alarms located on the monitoring system <br /> control panel. Turbine shutdown will occur if either power is lost to the control panel or <br /> if the turbine sump probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a"Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of Harbhajan&Devinder Shergill,Franchisees,or their <br /> designated duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik <br /> Stop Markets,Inc. Mike Karvelot,Director of Environmental Affairs,will authorize all repairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the attached Simplified Response Plan. <br /> F. The monitoring panel,probes, and LLDs are tested/certified annually. Preventive <br /> maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br /> certification. SB-989 testing is conducted tri-annually in November('03, 106, ad infinitum). <br /> G. A description of the gasoline system and operator's responsibilities are discussed <br /> in the Franchise Agreement. Initial training in operation of the tank system and monitoring <br /> equipment is conducted"on the job"under the supervision of Quik Stop personnel and the <br /> Designated UST Operator. <br />