Laserfiche WebLink
f+ STE Foos <br />•,04 13:37 FAX 916371527 TITAN PME WSAC <br />i" Phil'-ite Enc■ prises <br />Phil -rite $5100-F and 85101-19V Series SPill Collectors <br />INSTALLATION INSTRUCTIONS <br />Introduction <br />r <br />Phil -rite Enterprises Spill Containers (Fill and Vapor) are designed to pro��de easy, <br />installation and/or removal of the spill bucket without the need for timely excavation, <br />cutting concrete or disassembly of secondary containment covers. Phil-Tite's drain <br />valves drain directly into the tank, providing a fast and complete removal of excess <br />liquid spilled during a product delivery operation while maintaining a reliable seal that is <br />vapor and liquid tight, eliminating leaks into the environment. All Phil-Tite's Spill <br />Collectors have straight machined threads (female threads where the spill bucket <br />screws onto the riser adaptor.) All SpillCollectors No assehipped mbly is required.) Note:ed EVR <br />and CARS Phase I EVR Tested and Certified <br />certified systems the drop tube is installed under the fill spill bucket. <br />INSTALLATION: <br />faire erg - For new or upgraded UST's. <br />1. Method 1 - Cut and thread your steel tank riser to allow approximately 171/4" <br />(Fill) 17" (Vapor) from top of the M/F 4X4 adaptor to finish grade or top of the <br />diamond plate manway cover. This measurement will achieve 5 gallons <br />capacity. Sere Figure 1. <br />Ensure there is adequate clearance to provide at least 4 7/16" to 4 34" inches <br />between the top of the Spill ontainer and the top of the stainless steel sleeve <br />once final installation is complete. Use a tape measures � ify.ch For <br />0a F and <br />installation use the Styro-foarh spacer that is shipped <br />85101 -NV Spill For 5 gallon <br />nththis sr Correctly <br />e� <br />et <br />the depth of the blackpit bucket below de ie stainless steel sleeve. <br />Figure 2. <br />2. e h - Using a tape measure, measure from top of the tank to fi��+sP grade or <br />top of the manway cover. This is measurement "A". For Fill Spill Collectors <br />(85100-F) subtract 18 518" from measurement "A" to equal <br />l omI"A" The18" <br />- xxx". For vapor spill collectors (85101 -NV) �lkbt,. <br />results is the length of your riser measured from the top of the tank. Cut and <br />thread one end of your 4" riser and dry fit it into the tank bung. Measure your <br />riser (installed into the tank bung) from top of tank to the dimension above, mark <br />your riser. Cut this riser on the mark made above and thread this end. See <br />Figure 1. <br />Stec) 2 --Dry Fit All QpMQQ1l&W1 <br />all <br />Dry fit your riser to verify your measurements. After you have dacryfitted ved fuel <br />components and are satisfied with your measurements, appy pp <br />resistant, non hardening thread sealant (pipe dope) to the NPT threads on both <br />ends of the tank risers. <br />Page 1 of 6 <br />