Laserfiche WebLink
enclosure for the Incon ULS 2 wire sensor. <br />Inside of the building the speaker circuitry will be captured in a 0.5 inch emt conduit <br />run and enter the existing Incon ATG at the low voltage wire contact block. <br />This work involves #1/#2 hose positions and #3/#4 hose positions. <br />Hunzicker Electric will perform the hardwiring of the system. (Shields, Harper and Co is <br />scheduled to program the Incon ATG with the two new sensor positions. these sensors <br />will be programmed with the positive shutdown feature. Afford a Test is scheduled to <br />perform the certification of compliance for this new equipment. <br />The work with the fill point upgrades will involve replacing the existing fill and vapor <br />containments with ARB approved Philtite bucket assemblies (EVR). The existing <br />underground storage tanks have the OPW 233 extractor valve and the check valve <br />assembly in place, so a requer is a e to utilize the OPW 4.0 inch straight drop tube <br />without the drop tube over fill valve. <br />Hunzicker Electric will perform an ST -30 test prior to backfill of the work area. The <br />choice of backfill material is the same material excavated for the work. <br />Afford A Test will be utilized to perform the tests required by the Air Resources Board. <br />Hunzicker Electric encourages your office to have an inspector present for any portion of <br />this work. <br />I thank you for your time and consideration in approving this request for permitting. <br />Sincerely, <br />an R. Hunzicker <br />