My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_1999-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:05:39 PM
Creation date
6/23/2020 6:55:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2008
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_1999-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
enclosure for the Incon ULS 2 wire sensor. <br />Inside of the building the speaker circuitry will be captured in a 0.5 inch emt conduit <br />run and enter the existing Incon ATG at the low voltage wire contact block. <br />This work involves #1/#2 hose positions and #3/#4 hose positions. <br />Hunzicker Electric will perform the hardwiring of the system. (Shields, Harper and Co is <br />scheduled to program the Incon ATG with the two new sensor positions. these sensors <br />will be programmed with the positive shutdown feature. Afford a Test is scheduled to <br />perform the certification of compliance for this new equipment. <br />The work with the fill point upgrades will involve replacing the existing fill and vapor <br />containments with ARB approved Philtite bucket assemblies (EVR). The existing <br />underground storage tanks have the OPW 233 extractor valve and the check valve <br />assembly in place, so a requer is a e to utilize the OPW 4.0 inch straight drop tube <br />without the drop tube over fill valve. <br />Hunzicker Electric will perform an ST -30 test prior to backfill of the work area. The <br />choice of backfill material is the same material excavated for the work. <br />Afford A Test will be utilized to perform the tests required by the Air Resources Board. <br />Hunzicker Electric encourages your office to have an inspector present for any portion of <br />this work. <br />I thank you for your time and consideration in approving this request for permitting. <br />Sincerely, <br />an R. Hunzicker <br />
The URL can be used to link to this page
Your browser does not support the video tag.