Laserfiche WebLink
� � •• l ice, ii ��l �I <br />WR ; MONITORING AND RESPONSE PLAN <br />UNDERGI . 3 STORAGE TANK MONITORING PROGRkU 0 1 2003 <br />This monitoring program must be kept UST location at all times. The information on thisoring rc.o,'are <br />conditions of the op ting permit. The pc. : �.it holder must notify Environmental Health Depart' <br />epa LTH <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or i9i�4ing <br />the change. Required by CCR 2632 (d) and 2641 (h) <br />FACILITY NAME 0l, 1VV ?"4,u O DATE 7 d 3 <br />FACILITY ADDRESS 500 <br />I Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />2.Describe the frequency of performing the monitoring for: <br />'TANKS 01-p'tq vy"- PIPING <br />3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel �J`Co � �� 1 <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors <br />Name and Model of Piping Sensors <br />Name and Model of Dispenser Sensors <br />Type of overfill prevention <br />0 C'(Z� <br />FX I <br />s4ACdA <br />v1-- lllz4e5 <br />5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes: No 0 <br />Does the turbine shut down if a sensor is disconnected? Yes O' No 0 <br />Does the turbine shut down is the monitoring panel loses power? Yes No 0 <br />6. How will the alarm history and subsequent maintenance be recorded? <br />., � f2Lo �e,o e�. b o -.e .i-� ✓Y 7 <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performyyd in? vet -"4 ::S)✓ve- <br />er.�o � ; ,x,10. ✓� � f Cit � � o� � �vr�.� f.�" <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before December3l, 2003. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. , <br />I: mstemi-le\USTlmonitoringplan.doc <br />1/24/2002 <br />