Laserfiche WebLink
San Joaquin County <br />.�o Environmental Health Department <br />Za 600 East Main Street <br />Stockton, California 95202-3029 <br />Website: www.sjgov.org/ehd <br />tember 22, 2010 Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Steve Zwahlen <br />Franzen Hill Corp. <br />1100 N. J St. <br />Tulare, CA 93274 <br />Re: Waterloo Liquors <br />2512 E. Waterloo Rd. <br />Stockton, CA 95205 <br />FILE COPY <br />DIRECTOR <br />Donna Heran. REHS <br />PROGRAM COORDINATORS <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />SR0061062 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace boots on UDC #1/2 and #3/4 using Diversified Shallow <br />Dispenser Pan Repair Kit on the underground storage tank (UST) system at the above noted <br />address. The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. The proposed equipmenticomponents must be installed in accordance to manufacturer's <br />instructions and third -party approved. <br />4. Contact Jeff Wong at (209) 468-0335 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Secondary containment testing on both 87 octane and 91 octane fuel piping. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />5. If concrete will be broken near the UST or piping, a secondary containment test mustle <br />performed on the UST or piping once concrete is poured in accordance with the <br />manufacturer's guidelines. <br />6. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />