Laserfiche WebLink
s <br /> MF UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN JIR 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(')• <br /> L FACHJff WFORMTION <br /> FACILITY ID#(Agency Use Only) - - <br /> BUSINESS NAME(Same as FACILITY NAME) PS 3. <br /> BUSINESS SITE ADDRESS Z c)� (A) (®p 10i. CH�, e/ o�t j 104. <br /> H.EQUIPMENT TESTING AND PREVMWE MAPMMANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> 490.3a <br /> MONITORING EQUIPMENT IS SERVICED t.ANNUALLY [199.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. M-L SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)494D-4 <br /> IV.TANK MONITORING IS PMFORbED USING:THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 10 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49" <br /> PANEL MANUFACTURER: nJCV,✓ 49° MODEL#: -U_,550 490-9 <br /> LEAK SENSOR MANUFACTURER: T=j C.p^J a�9. MODEL#(S): E c-S 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKIS).(23 CCR$2643) 490.11 <br /> PANEL MANUFACTURER: a9°11 MODEL#: C 450-13 <br /> IN-TANK PROBE MANUFACTURER: PJ 66 AJ 490.14. MODEL#(S): 490.15 <br /> LEAK TEST FREQUENCY: ® a.CONTINUOUS ❑ b.DAILY/NIGHTLY ® c.WEEKLY 490-16 <br /> d d.MONTHLY ❑ e.OTHER(Specify): 49D-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 ❑ h. ❑ S 490.18 <br /> g.p.h. b.0.2&P• c.OTHER( P�fY): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490"20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ &36 HOURS ❑ b.60 HOURS 422 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 4W23 <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY [I a 490-24 OTHER(Specify}: 490,25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490.27 <br /> V.PIPE MONffORMG IS PEWO USING THE FOLLOWING METHODS)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE!PIPING SUMP(S)AND OTHER SECONDARY CONT NT WITH AUDIBLE AND 4� <br /> VI UAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID FILLED [3c.PRESSURIZED ❑d UNDER VACUUM 490 <br /> PANEL MANUFACTURER: .2NC,VAJ 450.30 MODEL#: S- () 490-31 <br /> LEAK SENSOR MANUFACTURER 490'32 MODEL#(S): L 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. goa.YES ❑b.NO 4W34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. aa.YES ❑b..NO 49033 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gph.LEAK TESTS AND RESTRICTS OR OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CR 490.36 <br /> MLLD MANUFA S): 37 MODEL#(S): i r� �� 90 38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)T*At2OtftfNELY PERFORMS 3.0 g p h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURER(S) 490110' MODEL#(S): 490.41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.14 <br /> 4.PIPE INTEGRITY TESTING 49445 <br /> TEST FREQUENCY a.ANNUALLY K b.EVERY 3 YEARS 0 c.OTHERS i 49046490.47 <br /> El 5.VISUAL PIPE MONITORING. 490.48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> Allowed for ami of unburied fud p:aping ordy per HSC§25281. 3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§ aX3),. 49050 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 49492 <br /> ❑ 99.OTHER(Specify) 450-93 <br /> UPCF UST-D(17/2007)1/4 <br />