Laserfiche WebLink
a <br />around the Snap Tap threads. <br />j. , Replace the caps over the. quick -connect couplings and <br />tighten snugly. <br />DO NOT overtighten. <br />® See technical bulletin #042-111-1 for use of Snap <br />Tap Connector Assembly. <br />7. Connect power to pump at the load center. " <br />8. Clear remaining air from system as follows: <br />a. Turn on dispenser that is farthest from the leak detector <br />-b t do not open nozzle: Wair4 of 5 minutes ormore. <br />Look for leaks on parts worked on. <br />b. Shut off the pump and allow it to stand four or five <br />minutes. Then startthe pump again <br />nozzle farthest from the leak detector. <br />c. Continue to dispense enough gasoline, ab <br />gallons (76 to 114 liters), to pump ALL <br />system. Y <br />E <br />+ <br />For FX2V modelsP <br />a. <br />Remove 1/4 -inch pipe plug from tank test port in the <br />®. If flow is restricted to about 3 gpm (ll 1pm) or fess <br />Packer (on 6 -inch Big -Flo applications, remove the <br />with the nozzle open, the leak detector has not <br />1/4 -inch pipe plug from the riser/flanje assembly). <br />opened. Repeat step 8a with increased running <br />b. <br />Apply a UL -classified non-toxic pipe thread sealant to <br />time of pump to insure the purging of all air. All air <br />the 1/4 -inch NPT 45 -degree elbow and install in tank' <br />must be purged from the system or the leak <br />detector will restrict flow to about 3 gpm (11 Ipm). <br />test port of the packer. On 6 -inch Big -Flo applications, <br />the 1/4 -inch NPT 45 -degree elbow may be •installed <br />`9. Affix the enclosed decals to the dispenser dial glass on grade <br />into the riser/flange assembly. <br />of gasoline upon which the leak detector is being installed. <br />c <br />---- <br />e thread sealant <br />lpandlpinstall <br />tomerst at <br />decals are bassureltheervic <br />a <br />- <br />18001262- <br />- <br />the 1/4 mch1NPT�hex nippteassified — <br />on 45 degree <br />539 <br />usare <br />elbow that. is in the tank test port (or on 6 inch Big -Flo <br />ti ande <br />10. Inspect all .threaded ,loints toy gh not <br />riser/flange assembly <br />leaking. <br />d. <br />Apply a UL -classified non-toxic pipe thread sealant to, <br />the 1/4 -inch NET tee and install on the hex nipple to <br />est Of the Leak Detector <br />accommodate both the vent tube and the snap tap: <br />U.S. Environmental Protection ,Agency (EPA) regulations require <br />e. <br />Apply a UL -classified non-toxic pipe thread sealant to <br />annual verification of _operation of leak detector. To assure <br />the threads of the 1/4 -inch NPT 90 -degree elbow vent <br />of the 1/4-inch <br />maintenance of leak detection capability, Red Jacket requires that. <br />tube fitting. <br />operanonof�t-lie-mechaaziical leak -detector be verified by testm`g upon <br />f. <br />Apply a UL -classified non-toxic pipe thread sealant to <br />start-up and that testing of the leak detector be performed routinely at <br />the threads of the 1/4 -inch NPT straight vent tube <br />least annually. <br />fitting and install in the leak detector vent opening in <br />the cap of the leak detector. F <br />r <br />®' ?'t Test procedure options for mechanical leak <br />g: <br />Install the vent.tubing mto:bothfittings,and tighten per <br />detectors are explained in Red Jacket Engineering <br />instructions on package. <br />Reports, RJ20 and Rd21. The Red Jacket:Snap Tap <br />h. <br />To install snap. dap connectors in FX2V/FX21)V <br />Connectors allow the FX2V/FX2DV leak.,detector <br />models, apply a UL -classified non-toxic, thread <br />to be tested with the EXV Snap Tapdiester as An <br />sealant to the snap tap connectors and install one in the <br />option to the above test methods. See: Red Jacket <br />body of the FXV leak.detector and. the other. in the tee <br />literature .#042-111-1 for test instructions using <br />attached to the hex nipple' attached to the 45 -degree <br />Snap Tap Connectors. <br />elbow installed in the tank test.port of the packer. On 6- <br />11. The top cover on the Red Jacket Leak detector is designed to <br />inch Big -Flo applications, install the two snap tap <br />accommodate .a sealing wire which can be used, to <br />connectors - one in the body of the FXV leak detector <br />discourage tampering or the unauthorized removal of leak <br />and one in the riser/flange assembly. <br />detector. (See Figure 2). <br />i. <br />Attach and crimp loop of the retaining tether <br />a <br />around the Snap Tap threads. <br />j. , Replace the caps over the. quick -connect couplings and <br />tighten snugly. <br />DO NOT overtighten. <br />® See technical bulletin #042-111-1 for use of Snap <br />Tap Connector Assembly. <br />7. Connect power to pump at the load center. " <br />8. Clear remaining air from system as follows: <br />a. Turn on dispenser that is farthest from the leak detector <br />-b t do not open nozzle: Wair4 of 5 minutes ormore. <br />Look for leaks on parts worked on. <br />b. Shut off the pump and allow it to stand four or five <br />minutes. Then startthe pump again <br />nozzle farthest from the leak detector. <br />c. Continue to dispense enough gasoline, ab <br />gallons (76 to 114 liters), to pump ALL <br />system. Y <br />It should be noted that if the dispensing system (the <br />Nazi : EM solenoid valve and the nozzle) is opened previous to <br />the completion of the line test,. the FXV Series will <br />detect this opening as a,leak and restricted flow <br />will result. Closing of the nozzle(s) for a period of <br />time adequate to allow completion of the line test <br />will allow the leak detector to open. Once opened, <br />full pump floNy can be provided. <br />r <br />and open the FX2V / FX2DV <br />out 20 to 30 <br />air from thep <br />SNAP TAP <br />'Figure 2 <br />O <br />SEALING WIRE t <br />(provided by contractor) <br />+ <br />o <br />t <br />Y ]Figure 2 <br />TETHERED <br />CAP <br />45° ELBOW tl <br />l <br />,1 /4 -INCH <br />T -FITTING <br />F <br />NT TUBE <br />f tl, dq <br />a}. <br />E <br />It should be noted that if the dispensing system (the <br />Nazi : EM solenoid valve and the nozzle) is opened previous to <br />the completion of the line test,. the FXV Series will <br />detect this opening as a,leak and restricted flow <br />will result. Closing of the nozzle(s) for a period of <br />time adequate to allow completion of the line test <br />will allow the leak detector to open. Once opened, <br />full pump floNy can be provided. <br />r <br />and open the FX2V / FX2DV <br />out 20 to 30 <br />air from thep <br />SNAP TAP <br />'Figure 2 <br />O <br />SEALING WIRE t <br />(provided by contractor) <br />+ <br />o <br />t <br />Y ]Figure 2 <br />TETHERED <br />CAP <br />45° ELBOW tl <br />l <br />,1 /4 -INCH <br />T -FITTING <br />F <br />NT TUBE <br />f tl, dq <br />a}. <br />