Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Page of <br />6. PIPING SUMP TESTING <br />❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />X Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />Sump # 1-87 <br />Sump # 2 -Diesel <br />Sump # 3-91 <br />Sump # <br />Sump Diameter: <br />42" <br />42" <br />42" <br />Sump Depth: <br />40" <br />40" <br />40" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />19" <br />19" <br />19" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />12'/2" <br />11" <br />12 %2" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 22" <br />Water Line 23" <br />Water Line 24" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />X Yes 11 No 11 NA <br />X Yes 11, No 11 NA <br />X Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe <br />shutdown?` <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />X Yes No ❑ NA <br />X Yes No ❑ NA <br />X Yes No [INA <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />1:25 <br />2:20 <br />1:30 <br />Initial Reading (RI): <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />1:55 <br />2:50 <br />2:00 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />X Pass 0 Fail <br />X Pass 0 Fail <br />X Pass 0 Fait <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and X Yes ❑ No ❑ NA X Yes ❑ No ❑ NA X Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) AA <br />