My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:16:02 PM
Creation date
6/23/2020 6:55:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 nd Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />11 Credentials': ® ICC Service Tech. ® SWRCB Tank Tester 11 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE / <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />Bucket Installation Type: <br />H2O <br />1 87 <br />® Direct Bury <br />❑ Contained in Sump <br />Equipment Resolution: <br />2 91 3 DIESEL <br />®Direct Bury Direct Bury <br />❑ Contained in <br />❑ Contained in Sump SumpSum <br />1/16 <br />4 <br />Direct Bury <br />❑ Contained in <br />Bucket Diameter: <br />11 <br />11 11 <br />Bucket Depth: <br />13 <br />13 13 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (Ti): <br />1330 <br />1330 1330 <br />Initial Reading (Rj): <br />12 <br />12 12 <br />Test End Time (TF): <br />1430 <br />1430 1430 <br />Final Reading (RF): <br />12 <br />12 12 <br />Test Duration (TF — Tj): <br />1 HOUR <br />1 HOUR 1 HOUR <br />Change in Reading (RF - Rj): <br />0 <br />0 0 <br />Pass/Fail Threshold or <br />Criteria: <br />r. <br />TeResult. . �... Pass .: ❑ir. ,.°�' tits ,l�ai Q[ pass_. � ❑ Fail` ❑„_Pss ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />Date:06-29-12 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.