Laserfiche WebLink
All <br /> 7�UNDERGROUND STORAGE TFANK <br /> RESPONSE SPONS PLAN ®PAGE 1 (One form per facility) <br /> TYPE OF ACTION El1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) - - <br /> BUSINESS NAME(Same as FACILITY +TAME) R02• <br /> wot. - i Gvol-5 <br /> BUSINESS SITE ADDRESS FjR03. I CITY R04. <br /> Z s l Z }:r. /I pct R t�. 5r vc�G�Ci.re <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility s Hazardous Materials <br /> Business Plan. <br /> D If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste, will be stored in a properly labeled and sealed container.Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released producdwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Com lete only if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30. <br /> /lam nrJ/ ii N <br /> R11. R21. R31. <br /> 3srs ,(J�J <br /> R12. 1122. C A- �sx R32 <br /> R13. R23. 7t7 �r R33. <br /> R14, R24. /`t a, ... .'7('r TJ R34. <br /> R15. R25. "L xj 7 R35. <br /> tern,�l-C f <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)11S/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE R50. <br /> NAMERat. TITLE / R51, <br /> / <br /> NAME R42. TITLE R52. <br /> NAME R43. TIME R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection ,Inspection by qualified persons 0 Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(1212010)-1/3 <br />