Laserfiche WebLink
07/24/2003 12:44 4089710 5 SSS INC PAGE 05 <br /> Monitoring,System Certification-Page 3 of 3 <br /> Site Address: 2375 W. Grant Line 0..1-205 Date of Testing/Servicing: 06/03/03 <br /> F. In-Tank Gauging/SIR Equipment'. M Check this box if tank gauging is used only for inventory control. <br /> ❑ (;heck this box if no tank gauging or SIR equipment.iti installed. <br /> This section must be e.omPk-I i if in-tank gauging equipment is used to perform leak detectioli monitoring. <br /> COEn Icte the foilint,checklist: <br /> ❑Yes D No* 11as all input wiring been inspected for proper entry and termination,including testing for ground faults <br /> Q Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested'? <br /> ©Yes ❑ Noy Was accuracy of system water levet readings tested? <br /> ®Yes © No* Were all probes reinstalled.properly? <br /> ®Yes ❑ No's Were all items on the equipment manufacturers maintenance:checklist completed? <br /> *In Section.9 below,describe bow and when these deficiencies were or will be corrected. <br /> G. .Line Leak Detectors (LLD)- 0 Check this box if LLD's are not installed. <br /> Com lets the followin checklist- <br /> ®Yes ❑No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD pciforn=cc? <br /> tl N/A (Check all that apply) Simulated leak reate: ® 3 g,p.h.(1.); a 0.1 g.p.h.(2.); 0 0.2 g.p.h.(2.). <br /> Notes: 1, Required for equipment dart-np certification and annual certification. <br /> 2. Unless mandated b local agenc ,certification re uired only for electronic LLD start-up. <br /> ®Y <br /> Yes <br /> es 0 No* Were all LLD's confirmed o rational and accurate within regulatory requirements? <br /> a 13 No* Was the testing apparatus proper! calibrated'' <br /> ❑Yes 11 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> M NI <br /> M Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak'? <br /> ❑ N/A <br /> 10 Yes 13 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ®NIA or disconnected'? <br /> 0 Yes 13 No* For electronic LLD's,does the turbine automatically shut off if any poniuu of aiv��o., itoring system <br /> ❑N/A malfunctions or fails a test'? <br /> q,yes ❑ No* For electronic LLD's,have all accessibly wiring connections been visually inspected? <br /> ❑N/A <br /> L Yes ❑No's Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> F)f. <br /> Comments: <br />