My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR-09-2003 WED 11 ;06 AM GETTLER RYAN FAX N0, 7077893218 P. 01 <br /> GETTLER - RYAN INC. <br /> 9 <br /> 1364 North McDowell Blvd, Suite B2, Petaluma, CA 94954-1116 <br /> Phone (707) 789-3255, Fax(707) 789-3218 <br /> Q Date: _.... 4/9/03_ <br /> l-1 _ Number of pages including cover sheet: _ 2 <br /> To: Dennis Catanyag From: Jonathan Ramos <br /> San Joaquin County — <br /> Gnvironmental Health Phone: 707.789-3255 <br /> Fax : (707)789-3218 <br /> Phone: _ Shell Dill products <br /> '—" — --"- - Subject: 23'75 W. Grant Line Road <br /> Fax: 209-468-3433 <br /> Tracy,CA <br /> CC: <br /> RhMA1tKS: Urgent For your review ❑ Reply ASAP ❑ As requested <br /> Dennis, <br /> To clarify the issue of exposed Stainless Steel Band Clamps to backfill,we will be removing the external band clamps <br /> after the Bulkhead fill material has cured. PIease review the attached letter from the manufacturer of the Bulkhead <br /> fittings that indicates that the removal of the band clamps is an acceptable process. If you have any questions,please <br /> call me. <br /> Thank You, <br /> Jonathan Ramos <br /> Design Manager <br /> Gettler-Ryan Inc. <br /> i <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.