Laserfiche WebLink
0 It <br />August 21, 2002 <br />Dear Michelle, <br />Scope of work for the Shell site at 2375 West Grant Line Rd. <br />Tighten up secondary containment boots under dispensers 3/4, 21/22, 19/20, 11/12. <br />Replace secondary boots in turbine sumps. Install all new clamps on boots exposed. <br />Pressure up secondary lines at 5 psi for one hour. Pour concrete back in front of <br />dispensers and finish. Complete SB 989 test was performed after all repairs were <br />completed. No work was performed on any of the primary product lines. All work was on <br />the secondary lines and dispenser pans. A passing .10 gph test on product lines will be <br />sent to you. <br />If you have any questions or concerns, please feel free to contact me. Thank you for <br />your time. <br />Brandon Smith <br />Project Manager <br />Wayne Perry Inc. <br />(916) 834-5717 <br />