Laserfiche WebLink
Date May 13, 1998 <br />_t <br />r-1 <br />EMERGENCY RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify County of San Joaquin O.E.S. within 30 days of any <br />changes to the monitoring procedures, unless required to obtain approval before making the change. Required by Sections <br />2632(d) and 2641(h) CCR. <br />Facility Name Grant Line Shell <br />Facility Address 2375 W. Grant Line Road, Tracy <br />1. If an unauthorized release occurs, how will the hazardous substance be cleaned up? <br />Note: If released hazardous substances reach the environment, increase the fire or <br />explosion hazard, are not cleaned up from the secondary containment within 8 <br />hours, or deteriorate the secondary containment, then County of San Joaquin <br />O.E.S. must be notified within 24 hours. For small spills the on site personnel will <br />use absorbent material to clean un the released material.In the event of a larger mill. <br />the dealer will call 9-1-1 (if necessary), his/her Equilon Representative and the Equilon <br />SH&E Coordinator to assist in the emergency. <br />2. Describe - proposed methodsand equipment to be used for removing and properly <br />disposingof any hazardoussubstances. <br />Spenj absorbentbe placed into .. . t . r ►. . . .. <br />Local.Aft with a . Federal laws and regulations.additional <br />Wr be <br />.. . -. be the re=nding <br />3. Describe the location and availability of the required cleanup equipment in item 2 above. <br />Absorbent is maintained on site and restocked as needed Any additional equipment is <br />maintained by the contractor, and available on an as needed basis. <br />4. Describe the maintenance schedule for the cleanup equipment. <br />Absorbent is inspected weekly and reordered as needed. <br />5. List the name(s) and title(s) of the person(s) responsible for authorizing any work <br />necessary under the response plan: <br />Bill McEwan / Station Manager <br />Aura Mattis / Equilon Safety, Health & Environmental Coordinator <br />Alex Perez / Equilon Environmental Engineer <br />Brett Hovland / Equilon District Engineer <br />9 <br />