Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION CORRECTION SHEET <br />The following checked and/or underlined items are to be addressed on plans: <br />GENERAL <br />_,_, 1. Provide the name and address of the facility. <br />2. Provide the name, address, and phone numbers of the contractor(s), facility <br />owner(s), and operator(s). <br />3. Provide four complete sets of plans.to be retained by this office). <br />Include specification sheets, equipme.t brochures monitoring, and response <br />plans. <br />4. Provide plans to scale in nonerasable blueprint. <br />CONSTRUCTION STANDARDS <br />— T <br />1. Location(s) and number of tanks. <br />. Type of tank(s) to be installed. <br />A. Steel clad with fiberglass reinforced plastic. <br />1. 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br />in ground. <br />6 'berglass <br />• Striker plate dimensions and materials. <br />• Striker plates under all accessible openings. <br />C. Nonclad steel <br />1. Cathodic protection provided (including nuts, bolts, washers, etc.). <br />a. Approved by a corrosion engineer or NACE ,technician. <br />b. Document stating inspection method and frequency (Minimum semi- <br />annual inspection required). <br />D. Other types of tanks <br />I. Construction specification standards for durability. <br />3. Tank Capacity (List specific gallonage). � ) 12- L <br />4. Contents to be stored in each tank (Be specific). <br />A. Verification of product compatability with the tank(s). piping, monitoring <br />device(s). epoxy or silicone glues, etc. <br />I. List testing organization and approval. <br />5. Provide manufacturers written installation instructions. (Include allipin , <br />monitors, tanks. etc. <br />P 9 <br />Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br />is require ron BOTH the Primary and Secondary containment systems. <br />Double walled tanks using pressure or vacuum testing to monitor annular <br />space are exempt from testing secondary container. <br />Note - NFPA 329 "Precision Test" required upon completion of installations. <br />One test result copy to be sent directly to tYii department from the <br />testing company. <br />