Laserfiche WebLink
e <br />OPTION 2A <br />ARTICLE 3, SECTION 2633/2634 <br />MOTOR VEHICLE FUELS ONLY <br />CONSTRUCTION <br />.�1. ui rements s <br />A. proved tank construction material <br />B. L k interception and detection system which complies with Article 3, <br />Sec on 2631(c). <br />C. Membr a liners must comply with Article 3, Section 2633(e, (1), (2)0 <br />(3)9 (4 (6) and are only allowed for piping systems (Department Policy) <br />D. Demonstra a that the leak interception and detection systeMs protects <br />?round wat from contamination (Article 39 Section 2633(f), (1), (2), (3), <br />4), (5). (6 (7). <br />E. Pressurized p Ing systems must be installed with a leak detector that is <br />capable of auto tically shutting off the product pumps. <br />I. Any single wa component "tank or piping" requires daily inventory <br />reconciljiatio and annual precision tests as part of the monitoring <br />program. <br />F. Before covering, the to (s) and system(s) must be tested to NFPA 30, <br />Standards. <br />G. Before use - the tank(s) an se(s) must be tested in accordance to <br />NFPA 329. <br />H. Provide soil profile of vadose z e if membrane liners are used. <br />OPTION 26 <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONITORING <br />1. Requirements (leak in rception and detection system(s)). <br />A. Floor must be const eted on a firm base and sloped to a collection sump. <br />0. Access casings must be installed in accordance to Article 3, Section <br />2634 (c) 0 thru 6), (d 1). <br />C. Submit written monitoring d response plan as stated in Article 3. <br />Section 2634 (d) (1-3), 2634 (1-5). <br />D. Hard wiring of electronic monit ing systems is required. <br />E. Provide __manufacturer's written in llation instructions. <br />