My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />0 <br />Easy to transport and handle <br />The light weight of fiberglass makes <br />Dualoy 3000/L easier to transport <br />and handle than steel. A typical <br />service station requires from 800 to <br />1000 feet of piping. For 2 -inch steel <br />pipe, that's about 13/4 tons - a hefty <br />truckload. The same footage of <br />Dualoy 3000/L weighs less than <br />500 pounds and can easily be carried <br />on a light pick-up. One person can <br />unload enough Dualoy 3000/L for a <br />whole service station job quickly, by <br />hand, without a forklift. <br />Pipe end preparation is a large part of <br />overall job cost. Dualoy 3000/L pipe <br />arrives at the job -site with the ends <br />factory tapered. Fiberglass pipe and <br />nipples can be cut to length much <br />more quickly than steel, and the cut <br />ends tapered in a fraction of the time <br />needed to thread steel pipe. For <br />example, a 2 -inch end can be <br />prepared in less than 20 seconds <br />using a portable tapering tool for <br />on-site joint preparation. <br />Most steel pipe failures start at <br />threaded joints: threading the pipe <br />peels off the protective coating and <br />exposes the bare metal. By contrast, <br />the Dualoy 3000/L pipe wall is <br />constructed of inert materials <br />throughout, so tapering the pipe <br />end does not compromise its <br />corrosion resistance. <br />Dualoy 3000/L employs a deep - <br />socket bell and spigot adhesive joint <br />for faster joining than threaded steel <br />pipe. Matching tapers in bell and <br />spigot make a firm interference fit to <br />hold the joint together while the <br />adhesive cures. Ameron's standard <br />UL -listed adhesive cures at normal <br />temperatures without heating <br />blankets or outside heat sources. <br />For cold weather installations, the <br />necessary accessories are readily <br />available from Ameron. <br />n <br />A worker easily carries 100 feet of 2 -inch Dualoy 3000/L pipe during a service station rehabili- <br />tation. The same length of equivalent steel pipe would weigh over 350 pounds. <br />Dualoy 3000/L pipe is so easy to work with that it can be cut to length using an ordinary hacksaw. <br />The cut end of the pipe is then tapered with a portable tapering machine. Both cutting and <br />tapering can be accomplished without even getting out of the trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.