My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />11 <br />Apply a thin layer of adhesive to the tapered <br />areas of the spigot (left) and the bell (right). <br />Observe adhesive working time limitations. <br />:D E::::�,- <br />Avoid cocking <br />Avoid back -out <br />Making (stabbing) the joint <br />Align the mating surfaces so that they may be brought together in a <br />straight line. <br />• Insert spigot all the way into bell. <br />• Twist one quarter turn while pushing together to evenly distribute adhesive <br />and achieve a friction lock. <br />• Avoid cocking joint. <br />• Over -insertion can collapse the spigot end and cause a leaky connection. <br />• Under -insertion can cause a leaky connection. <br />• Do not drive the connection together with a hammer <br />• Do not disturb the connection while the adhesive is uncured. <br />• Do not move the pipe and fittings until adhesive is set. <br />Curing the adhesive <br />The times shown in parentheses indicate when sufficient cure has been <br />obtained to permit moving the assembly. Cure time is dependent on <br />temperature. <br />C20HT Adhesive Cure Time" <br />Temperature Cure Time <br />(°F) (°C) (hours) <br />65 18 12 (8) <br />70 21 5 (4) <br />80 27 4 (3) <br />100 38 3 (2) <br />120 49 2 (11/2) <br />150 66 11/2 (1) <br />" The product Literature for the CWHTAdhesive Kit contains <br />essential information on safety, handling, first aid and toxicity. <br />Read before using. <br />At temperatures below 65°F (18°C), C20HT epoxy adhesive will not gain <br />sufficient strength to make an acceptable bond. When temperatures are <br />expected to approach or be below 65°F during cure time, forced curing is <br />needed. <br />In temperatures at or below 65°F: <br />• Warm adhesive before mixing. <br />• Warm connecting surfaces before applying adhesive. <br />• Use a Chem Cure Pak or heating blanket. <br />FI <br />
The URL can be used to link to this page
Your browser does not support the video tag.