Laserfiche WebLink
C. Uescnbe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> _--------- <br /> -- --------- <br /> ------------ <br /> —--------------- <br /> ---------------------------------------- <br /> e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br /> Hauler Name K/ -- _ _-Phone( —) <br /> Hauler Registration# <br /> ---- City -Zip------ <br /> Permitted Disposal Site--__— -_------------- <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler: <br /> Name ---------- ---- --------------- <br /> Address-- city-----=------- Zip ------ <br /> Phone <br /> Hauler Registration # (if hauled as hazardous) — — — — ---- <br /> c. Piping Disposal Site: <br /> Name '`�� ---------- -- Phone (-----) ----- <br /> Address ---- City--- Zip--------- <br /> EPA ID (if transported to a permitted TSD facility)- --- -- <br /> 8. Is the sampling firm an independent third party from the contractor? YES [] NO [] <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be <br /> obtained: 41/ <br /> 3 <br />