Laserfiche WebLink
y JUL-04-2011 09:53 Service Station Systems 408 938 8888 P.10 <br /> Monitoring System Certification-Page 3 of 3 <br /> Site Address; 2375 W.Grant Line Date of Testing/Servicing: 6/10/11 <br /> F. In -Tank Gauging/SIR Equipment., Check this box if tank gauging is used only for inventory control. <br /> C3 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak deflection monitoring. <br /> Com tete the foil ina checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,i uding testing for ground faults? <br /> Q Yes ❑ No* Were all tank gauging probes visually inspected for damage and re ' ue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes Q No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's rn enance checklist completed? <br /> * in Section H below,describe how and when these deficiencies re or will be corrected. <br /> G. Line Leak Detectors(LLD), Check this box if LLD's are not installed. <br /> Com lets the foilowin checklists <br /> ❑ Yes ❑ No* For equipment start-up or ann equipment certification was a leak simulated to verify LLD performance? <br /> fl N/A (Check all that apply) Si seed leak rate: Q 3 g.p.h.(1.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required equipment start-up certification and annual certification. <br /> 2. Unless andated by local agency,certification a uired only for electronic LLD start-up, <br /> ❑ Yes ❑ No* Were all LLD's c firmed o erational and accurate within reg!4latory regulatoryrequirements'? <br /> C3 Yes ❑ No* Was the testi apparatus Er22erlZ calibrated? <br /> ❑ Yes ❑ No* For meek seal LLD's,does the i.LD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For ectronie LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Noy Arorelectronic LLD's,does the turbine automatically shut off if any portion ofthc monitoring system is disabled <br /> ❑ N1A,1 or disconnected? <br /> Q Yes ❑ o* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> Q Yes ❑ No* for electronic LLD's,have all accessible wiring connections been visually inspected? <br /> LILN/A <br /> No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section HI below,describe how and when these deficiencies were or will be corrected, <br /> H. Comments; TLM's and LUD's are monitored by Veeder Root <br /> TOTAL P.10 <br />