My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:22 PM
Creation date
6/23/2020 6:56:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2375\PR0232469\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN,-20-2011 07:42 Service Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ® Other(Spec) <br /> Test Method Used: ® Pressure p Vacuum ❑ Hydrostatic <br /> ❑ Other(Spee) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Run#R9 A Piping Run#87 A Piping Run#91 A Piping Run#Diesel A <br /> rZpmS <br /> ial: Fiberglass Fiberglass Fiberglass Fiberglass <br /> facturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" '" <br /> Length of Piping Run: 100' 100, 100' 100' <br /> Product Stored: Gasoline Gasoline Gasoline Diesel <br /> Method and location of Reducer$000ffittinp Reducer lioots/Bittiugs Reducer Hootsll'Sttiogs Reducer BooWflttiugs <br /> piping-ran isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 9:00 am 9:00 am <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 10.00 am 10:00 am <br /> Final Reading 5 psi 5 psi <br /> Test Duration: 1 hour I hour <br /> Change in Reading(PF-R,): None None <br /> PassNail Threshold or No Detectable Doss No Detectable Loss <br /> Criteria: <br /> Test Result: 0 Pass ❑ Fail 1 Q Pass ❑ Fail ❑ Pass ® Fail 1 ❑ Pass ®Fail <br /> Comments—Lclude in ormation on repairs made rior to testing, and recommended ollow-u orfailed tests) <br /> 9 1 A and Diesel A failed.Torn test boots <br />
The URL can be used to link to this page
Your browser does not support the video tag.