Laserfiche WebLink
t T <br /> 1W 1W <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> 8501 N MOPAC EXPRESSWAY,SUITE 400 <br /> TEST DATE: 05/28/10 AUSTIN,TEXAS 78759(512)451-6334 WORK ORDER NUMBER: 2274700 <br /> CLIENT: SHELL OIL COMPANY SITE: SHELL CC # 136187 <br /> M x <br /> l r,• i,i n,s ��a. �a r�i '. ,7�F <br /> Tank ID: 1 Tank manifolded: No Bottom to top fill in inches: 92.0 <br /> Product: REG UNLEAD Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 11,527 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 405 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> 2 TURBINES FOR TANK. <br /> TRK T.ES `,. tfL'T�r <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VEEDERROOT VEEDERROOT <br /> Fluid volume in gallons: Model: ELECTRONIC ELECTRONIC <br /> Tank water level in inches: S/N: 219293 024130 <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: 37 36 <br /> Specific gravity: Resiliency cc: <br /> Water table depth in inches: Test leak rate ml/m: 189.0 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib.leak in gph: 3.00 3.00 <br /> Result: Results: PASS PASS <br /> COMMENTS COMMENTS <br /> AE'tv r' 11 mo <br /> if <br /> Test time: <br /> Ullage volume: Material: DW FIBERG <br /> Ullage pressure: Diameter(in): <br /> Results: Length(ft): <br /> Test psi: <br /> DATA FOR UTS-4T ONLY: Bleedback cc: <br /> Time of test 1: Test time(min): <br /> Temperature: NOT Start time: NOT NOT NOT NOT <br /> Flow rate(cfh): TESTED End time: TESTED TESTED TESTED TESTED <br /> Time of test 2: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE PRESSURE <br /> Time of test 3: Pump make: RED JACKET RED JACKET <br /> Temperature: <br /> Flow rate(cfh): Impact Valves Operational: YES <br /> COMMENTS COMMENTS <br /> IL 11 <br /> Printed 06/07/2010 09:12 ACRAMER <br />