My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 4:12:21 PM
Creation date
6/23/2020 6:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJ <br />S. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />IMEMEM Sam <br />Piping Run # <br />Piping Run # 87-A Piping Run # 91-A Piping Run # 89-A <br />Diesel <br />Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron Ameron <br />Piping Diameter: <br />3" <br />3" <br />3" 3" <br />Length of Piping Run: <br />100, <br />100, <br />100, 100, <br />Product Stored: <br />Diesel <br />Gasoline <br />Gasoline Gasoline <br />Method and location of <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings Reducer Boots/Fittings <br />iping-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />10 minutes <br />10 minutes <br />10 minutes 10 minutes <br />starting test: <br />Test Start Time: <br />10:05 am <br />Initial Reading (Rj): <br />5 psi <br />Test End Time: <br />11:05 am <br />Final Reading (RF): <br />5 psi <br />Test Duration: <br />1 hr. <br />Change in Reading (RF-Rj): <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss No detectable Loss <br />Test Result: <br />❑ Pass 0 Fail <br />© Pass ❑ Fail <br />❑ Pass i] Fail ❑ Pass ® Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />DSL, 91-A, 89-A — All failed due to torn test boots. <br />_u <br />Z-s"- <br />ae <br />
The URL can be used to link to this page
Your browser does not support the video tag.