Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for GRANT LINE SHELL* as of January 17, 2018. <br /> Open violations from May 31,2017 inspection <br /> Violation#301 -UST system is not operated to prevent unauthorized release, including spills and overfills. <br /> Thirty-six month secondary containment testing was performed on April 12, 2017, and most of the components that <br /> were tested failed. To date, none of the failed components has been repaired. The underground storage tank <br /> system shall be operated to prevent unauthorized releases. Immediately have a properly licensed, trained, and <br /> certified contractor repair or replace the failed components and provide test results to the EHD. <br /> Page 1 of 1 <br />