Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: 324.02 <br />r—,d.&® fho frdlndrharkliQf- <br />0 Yes <br />0 No" <br />Is the audible alarm operational? <br />0 Yes <br />0 No* <br />Is the visual alarm operational? <br />0 Yes <br />0 Ne <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />C9 Yes <br />0 N6* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />0 Yes <br />0 No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />0 N/A <br />0 Yes <br />0 W <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />0 N/A <br />fads to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) 0 Sump/Trench <br />Sensors; 0 Dispenser Containment Sensors_ <br />Didyou confirm positive shut -down due to leaks gnd sensor failure/disconnection? 0 Yes; 0 No. <br />0 Yes <br />0 No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />0 NIA <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm bagger? % <br />0 Yes <br />0 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />OYes* <br />19 No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appfy) <br />[I Product 0 Water. If yes, describe causes in Section E, below. <br />Yes <br />0 W <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />0 Yes <br />0 Ne <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />