Laserfiche WebLink
SWRCB, January 2002 <br />Page of <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: San Joaquin County Downtown Garage I Date of Testing: July 11, 2012 <br />Facility Address: 121 South San Joaquin Street, Stockton, Ca. 95202 <br />Facility Contact: Connie Worden I Phone: (209) 468-2068 <br />Date Local Agency Was Notified of Testing: 7/6/2012 by Afford -A -Test <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-1120/ICC#5246802-UT <br />Manufacturer Training <br />Manufacturer Component(s) Date Training Expires <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #I <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #4 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #5 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #6 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />I ❑ <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />�tl92lACJ9a <br />Technician's Signature: �eaiii Date: July 11, 2012 <br />