My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 3:25:01 PM
Creation date
6/23/2020 6:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232594_121 S SAN JOAQUIN_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />E <br />SWRCB, January 2002 Page of <br />9. FILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sums <br />❑ *See comments below <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Other (Specie) <br />❑ Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Fill Sump # <br />Fill Sump # Fill Sump # Fill Sump # <br />Sum Diameter: <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />d' <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />water and starting test: <br />�1- <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result:• <br />Is there a sensor in the sump? <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />*This UST Facility has a combination Piping Sump for Remote Fill Piping and Remote Vapor Piping. <br />*Data is recorded on Page #5 of this report for Piping Sump #2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.