Laserfiche WebLink
SAN JOAOiWOUNTY ENVIRONMENTAL HEALTPARTMEN'1' <br />UNDERGROUND STORAGE TANK <br />ONITO LAN - PAGE 1 <br />- <br />TYPE OF ACTION ❑ 1. NEW PLAN 2. CHANGE OF INFORMATION <br />M01. <br />M02. <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />MAY 2 1 2004 <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION ENVIRONM FAI TW <br />FACILITY ID # (Agency Use On <br />' <br />M03. <br />FACILITY NAME y L <br />FACILITY SITE ADDRESS ! p� CITY !� j'6S <br />M05. <br />II. EQUIPMENT TESTING VENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />Such must be by qualified personnel. <br />M06. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. work performed <br />M07 <br />MONITORING EQUIPMENT IS SERVICED 'g 1. ANNUALLY ❑ 99. OTHER (Specify): <br />1ILMONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />If already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />line leak detector, monitoring system control panel, etc.). you <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />'. <br />MIO. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />Mu <br />SECONDARY CONTAINMENT IS: . DRY b. LIQUID FILLED t El c. UNDER PRESSURE ❑ d. UNDER VAC M <br />M13. <br />M12. MODEL #: A . Z ; <br />PANEL MANUFACTURER: '' <br />M15. <br />M14. MODEL #(S): s . <br />LEAK SENSOR MANUFACTURER: <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MQNITOR SINGLE WALL TANK(S) <br />MIT <br />K <br />PANEL MANUFACTURER: MODEL #: <br />M19. <br />M18 MODEL #(S): <br />IN -TANK PROBE MANUFACTURER: <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY El c. WEEKLY <br />M2o. <br />e.(Specify): M21.u1. <br />❑ d. MONTHLY E3OTHERS f (p y)' M22. <br />M23. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />M24. <br />3. INVENTORY RECONCILIATION a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />M25. <br />TESTING PERIOD: 11a. 36 HOURS b. 60 HOURS <br />5. INTEGRITY TESTING PER 23 CCR §2643.1 M26. <br />M27. <br />TEST FREQUENCY: a. ANNUALLY ❑ b. BIENNIALLY F1 c. OTHER (Specify): <br />6.VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY (Requires agency approval) <br />M28 <br />❑ 99. OTHER (Specify): <br />V. PIPE MONITORING <br />'> <br />M30. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />❑ I. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />M31 <br />SECONDARY CONTAINMENT IS: Ela. DRY E] b. IQUID FILLED E] c. UNDER PRESSURE El d. UNDER VACUUM <br />M33 <br />/cd M32. MODEL #: <br />PANEL MANUFACTURER: <br />M35. <br />Mia. MODEL #(S): <br />LEAK SENSOR MANUFACTURER:M36. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />WILL FAILURE/DISCONNECTION OF THE MONITORNG SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M37. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED M38.M39. <br />MODEL #(S): <br />MLLD MANUFACTURER(s): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUYNELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />M41. <br />AlZa Mao. MODEL #: <br />ELLD MANUFACTURER: <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />� a. YES ❑ b. NO <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN. ❑ <br />Mai. <br />Ma4 <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? Ela. YES El b. NO <br />4. INTEGRITY TESTING Mas. M46. <br />TEST FREQUENCY: t5 a. ANNUALLY El b. EVERY 3 YEARS El c. OTHER (Specify) <br />�5.VISUAL MONITORING DONE: 1K a. DAILY ❑ b. WEEKLY* ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED*" <br />* Requires agency approval °t Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(6)(3) <br />M47, <br />6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(,)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />M48. <br />U yy. U I rtcsrc t3pecuy� <br />07/23/03 <br />SJCEHD-d (07/03) -1/4 <br />