Laserfiche WebLink
e <br />h E, <br />-, <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box K tank gauging is used only for inventory control. <br />❑ Check this box N no tank gauging or SIR equipment is installe <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. �� <br />❑ <br />complete the tonowmg cnecxust: I <br />Yes ❑ No' Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in oecuon n, oerow, uwwriue nuw aim when auvav umw.mw.va wv.v — -1.1 .,a —1 -- <br />Line Leak Detectors (LLD): ® Check this box if LLDs are not installed. <br />❑ <br />Yes _ <br />v❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />N/A <br />Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h; [10.2 g.p.h. <br />❑ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: SUCTION <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />