My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2771
>
2300 - Underground Storage Tank Program
>
PR0234251
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 1:46:47 PM
Creation date
6/23/2020 6:56:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0234251
PE
2361
FACILITY_ID
FA0003508
FACILITY_NAME
TULARE FARMS LLLP
STREET_NUMBER
2771
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
17710025
CURRENT_STATUS
01
SITE_LOCATION
2771 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0234251_2771 E FRENCH CAMP_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />REQ�IVF.D <br />SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) ONMENIAI <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hyd t 1'r <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # I -Diesel UDC # 2 -Gas UDC # UDC # <br />UDC Manufacturer: Unknown Unknown <br />UDC Material: <br />Fiberglas Fiberglass <br />UDC De the <br />22" 20" <br />Height from UDC Bottom to Top <br />Enters from bottom Enters from bottom <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />12 '/2" 11 %" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry Dry <br />testing: <br />Portion of UDC Tested <br />Water Line 15" Water Line 14" <br />Does turbine shut down when <br />N/A -Safe Suction N/A -Safe Suction <br />UDC sensor detects liquid (both <br />System System <br />product and water)?* <br />Turbine shutdown response time <br />N/A N/A <br />Is system programmed for fail- <br />N/A N/A <br />safe shutdown?* <br />Was fail-safe verified to be <br />N/A N/A <br />operational?* <br />Wait time between applying <br />5 Minutes 5 Minutes <br />water and startinE test <br />Test Start Time: <br />9:55 10:00 <br />Initial Reading (Ri): <br />.001 .001 <br />Test End Time: <br />10:25 10:30 <br />Final Reading (RF): <br />.001 .001 <br />Test Duration: <br />30 Minutes 30 Minutes <br />Change in Reading (RF -RI): <br />0 0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes .005/30 Minutes <br />Test Result: <br />Pass Pass <br />Was sensor removed for testing? <br />Yes Yes <br />Was sensor properly replaced and Yes Yes <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.