Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />Test Equipment Used: <br />7Material:r: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure and starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: ` <br />5. SECONDARY PIPE TESTING <br />❑ Industry Standard <br />❑ Vacuum <br />ing Run # <br />Page of <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Safe Suction System. <br />