Laserfiche WebLink
0 0 <br />SWRCB, January 2002 Page of <br />6. PIPING SUMP TESTING <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?" <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying water <br />and starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result. Q Pass © Fail 0 Pass 0 Fail CI Pss Fail Q Pass 0 Fail <br />Was sensor removed for testing? ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No [INA ❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes []No ❑NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />No Piping Sumps. Safe Suction System. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />