Laserfiche WebLink
SWRCB, January 2002 Page _ of <br />8. FILL RISER CONTAINMENT SUMP TESTING <br />Sump Diameter: <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />water and starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Re ding (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result. <br />Is there a sensor in the sump? <br />11 Pass DFiil <br />El Yes 11 No <br />OFaff <br />11 Yes 11 No <br />0 Pass 0 Fail <br />11 Yes 0 No <br />11 Pass D'Fail <br />11 Yes LJ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />[]Yes []No [INA <br />11 Yes 11 No 11 NA <br />11 Yes 11 No 11 NA <br />El Yes El No P NA <br />Was sensor removed for testing? <br />11 Yes 0 No 11 NA <br />El Yes 11 No 11 NA <br />EYes El No [INA <br />11 Yes 11 No 11 NA <br />Was sensor properly replaced and <br />verified functional after testin�9 <br />Ll Yes L1 No 11 NA <br />Ll Yes 0 No [INA <br />0 Yes 11 No F1 NA <br />11 Yes El No 0 NA <br />. Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />