My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2771
>
2300 - Underground Storage Tank Program
>
PR0234251
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 1:46:47 PM
Creation date
6/23/2020 6:56:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0234251
PE
2361
FACILITY_ID
FA0003508
FACILITY_NAME
TULARE FARMS LLLP
STREET_NUMBER
2771
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
17710025
CURRENT_STATUS
01
SITE_LOCATION
2771 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0234251_2771 E FRENCH CAMP_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed: <br />Comolete the followina checklist: <br />324.02 <br />91 Yes <br />n No* <br />Is the audible alarm operational? <br />xi Yes <br />u No* <br />Is the visual alarm operational? <br />Pq Yes <br />n No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />m Yes <br />u No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proe2r o ration? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />® N/A <br />u Yes <br />u No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />19 N/A <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. Did you confirm positive shut -clown due to leaks and sensor <br />failure/disconnection? 3 Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />® N/A <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capacity does the alarm t ' er? % <br />n Yes* <br />9 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement earls in Section E, below. <br />u Yes* <br />m No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) L Product; _ Water. If <br />es describe causes in Section E, below. <br />m Yes <br />n No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />91 Yes <br />n No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />System Cerdfication Page 2 of 4 12107 <br />2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.