Laserfiche WebLink
IED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK • <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490.546 <br /> ]$[1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS E-199.OTHER(Specify): <br /> ago-sODEL# _ 49as6.PANEL MANUFACUR <br /> LEAK SENSOR MANUFACTURER: k7 r, 490-51 1 MODEL#(S): 6t�c:N� $° n-ss <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS ®1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LI UID_Dt 2.PRESSURE [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490 141, <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR 42644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> [gAlarm logs 49o-6ga ®Visual Inspection Records 490-69b ❑Tank integrity testing results 490.68c <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490.68f ❑ Corrosion Protection 60-day logs 490-68g <br /> ❑Equipment maintenance and calibration records. 49MEh <br /> IX.TRAINING <br /> Eff Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-6% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> R THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTRADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> !40 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occur;,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following ers n(s)art re sible for performing the monitoring and equipment maintenpcp <br /> NAME 1�1(.Vl�.t Cx� 49-72 TITLE {�kN� 490-73 <br /> NAME %^& 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANTS 490-76 DATE: 490-77 <br /> 01-3 <br /> BURFSQ1JNQ1 0 1.Jjnk__ erato ed tative o caner <br /> APPLICANT NAME(p & , 490.78 APPLICANT TITLE: 490-79 <br /> P1 <br /> UPCF UST-D(12/2007)3/4 <br />