My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2000-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:31:54 PM
Creation date
6/23/2020 6:56:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2007
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2000-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />• <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />RESPONSE PLAN — PAGE 1 (one form per facility) <br />TYPE OF ACTION K 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION Rol. <br />L FACILITY INFORMATION <br />k <br />FACILITY ID # (Agency Use Only)04 <br />FACILITY NAME /y1'f4 A- M, CiV ��� �s E—S Roe. <br />`-" <br />FACILITY SITE ADDRESS Ro3. <br />L to a j <br />CY Roa. <br />IT <br />SLkl C -71—q rxd �o <br />H. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner ii required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br />to be effective. It will then be managed properly. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. <br />➢ Facility personnel will determine whether or not any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br />contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. <br />will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />I1I:?"SPILL CONTROL,.AND CLEAN=I1' EQUIPMENT <br />�,_ <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if a licable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20. <br />R30. <br />R11. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24. <br />R34. <br />R15. <br />R25. <br />R35. <br />-IV., RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME.3 A L A—�.- - ^ �� Rao. <br />J�-_ <br />TITLE V �, u F Rso. <br />V <br />NAME C 1" (-,lr[_ ft( D t l ft' ►tom C: <br />TITLE ©� <br />U� R5 1. <br />NAME R42. <br />TITLE R52. <br />NAME R43. <br />TITLE R53. <br />V. INDIRECT HAZARD DETERMINATION <br />This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used (e.g., where liquid level <br />measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br />THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br />CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br />R60. <br />SJCEHD-e (06/03) -1/3 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.