My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2000-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:31:54 PM
Creation date
6/23/2020 6:56:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2007
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2000-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br />ACDEH, August 2003 —of <br />8. FILL RISER CONTAINMENT SUW TESTING <br />- Facility is Not Equipped With Fill Riser Containment Sumps_.�, <br />Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard 11 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure El Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />manwrMT <br />Sump Diameter: <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing:.,.__ <br />De !h of Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />7 - <br />Test End Time. <br />Final Reading, (R <br />— - , 0: <br />Jest Duration: <br />-Change in Reading (RF -RI). <br />-Pass/Fail Threshold or Criteria: <br />Test Result: 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br />Is there a sensor in the sump? 0 Yes 0 No 0 Yes 0 No 01 Yes No Ej Yes El No <br />Does the sensor alarm when <br />either product or water is 0 Yes 0 No 0 NA 0 Yes E No ri NA 0 Yes C, No 01 NA 0 Yes '_ No E NA I <br />LICLUCLUU: <br />Was sensor removed for testing? EI Yes 0 No 0 NA <br />0 Yes [] No 0 NA <br />0 Yes DNo '--, NA <br />DYes ENo ON <br />Was sensor properly replaced and D Yes 0 No 0 NA <br />0 Yes C No DNA <br />0 Yes :--j No E, NA <br />I C! Yes E No 0 NIA <br />-verified functional after testinZ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.