Laserfiche WebLink
E <br />LI <br />ACDEH, August 2003 Page of 1 <br />9- SPILIJOVERFELL CONTAINMENT BOXES <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: 0 Pass 0 Fail 0 Pass 0 Pass 0 Fail 0 Pass 0 Fail <br />Comments — (include information on repairs made prior to tesling, and recon mendedfollow-upfor failed tests) <br />'50 11 [ C-,:� 4 U, <br />