My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s� <br />04UNDERGROUND STORAGE TANK SPSTEM <br />DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING REC., <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction RD <br />Authority Cited: Title 23, Div. 3, Ch. 16 California Code of Regulations (CCR) <br />Facility Name: <br />Facility Site Ad <br />Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br />provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br />underground storage tank (UST) systems. This training must be provided by July 1, 2005, and every 12 months thereafter. For <br />facility employees hired after July 1, 2005, the initial training must be provided within 30 days of the date of hire. At least one <br />of the facility employees present during operating hours must have current training. This training must include, but is not <br />limited to, the following items as specified in 23 CCR Sections 2715(#)(1) and (2): <br />❑ Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br />❑ The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br />❑ The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br />❑ Name(s) of contact person(s) for emergencies and monitoring equipment alarms; <br />❑ For facilities that are not routinely staffed, facility employee responsibilities as specified in the training program <br />approved by the local UST regulatory agency. <br />23 CCR § 2715(f)(3) requires that a list of employees who have been trained by the Designated Underground Storage Tank <br />Operator(s) be maintained on-site, or off-site at a readily -available location if approved by the local agency, and provided to <br />the local agency upon request. Completion of this form will satisfy UST training record keeping requirements. The following <br />Pmninvees have been trained as required by 23 CCR Sections 2715(f)(1) and (2): <br />(Continued on reverse) <br />If hired after July 1, 2005. <br />Z Trainer must be a current Designated UST Operator for the facility at the time of training. <br />UN -061 -112 <br />www.uoidots.org <br />07/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.