Laserfiche WebLink
AQU t ry <br />SAN JOAQUIN COUNTY <br />tn` ` ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />r -• •-. ..• -, • �, •. <br />Facility Name:, <br />Inspection Date: <br />Facility Address: <br />5 C77 <br />IN mechanical Model V WO <br />Service Request <br />6X800(a <br />electronic Serial #: b17 <br />1 r. �. • . ♦. <br />1 1 II&IDINI •ll <br />1111119-110 =44 <br />❑ line test programmed <br />Onsite Service Techni ian's Name: <br />Leak detector <br />ICCIII1cian/Installer Exp. Date: <br />Manufacturer Training <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />SERVICE <br />Leak detector <br />❑ <br />IN mechanical Model V WO <br />%❑ <br />electronic Serial #: b17 <br />1 r. �. • . ♦. <br />1 1 II&IDINI •ll <br />1111119-110 =44 <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />1 r. �. • . ♦. <br />1 1 II&IDINI •ll <br />1111119-110 =44 <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />III 1!giii� !1111111 r- <br />1 r. �. • . ♦. <br />1 1 II&IDINI •ll <br />1111119-110 =44 <br />WAR" <br />EHD 23-04 v <br />UST SERVICE REQUEST INSPECTION REPORT <br />Rev 10/06/10 <br />