My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 SCOPE OF WORK <br />1. EQUIPMENT <br />THE EQUIPMENT FOR THIS WORK IS TO BE FURNISHED BY THE OWNER UNDER <br />A SEPERATE AGREEMENT WITH THE SUPPLIER NORTHWEST PUMP COMPANY. <br />THE FUEL SYSTEMS CONTRACTOR IS TO INSTALL THE EQUIPMENT PER MFGS. <br />INSTALLATION INSTRUCTIONS AND INDUSTRY STANDARDS EXHIBITING GOOD <br />WORKMANSHIP. <br />2. PHASE II EVR _ <br />THIS WORK IS BEING PERFORMED TO MEET THE CURRENT REGULATIONS FOR <br />PHASE II EVR. <br />3. DISPENSERS <br />UPGRADE THE EXSTING DISPENSERS BY INSTALLING THE PROPER HANGING <br />HARDWARE. <br />4. VEEDER-ROOT CANISTER <br />INSTALL VEEDER-ROOT CANISTER MODLE NO. 861290-002 PER MFG. <br />INSTALLATION INSTRUCTIONS, IN ACCORDANCE WITH CSFM AND GARB <br />CERTIFICATIONS. THE LOCATION SHALL BE THE PRIMARY 87 GASOLINE TANK <br />2" VENT RISER, AT THE LOCATION SHOWN ON THE WORK PLAN DWG. F-1 <br />DATED 11/9/2008. A VAPOR PRESSURE SENSOR WILL BE INSTALLED ON THE <br />VENT STACK. <br />5. MONITOR PANEL <br />THE UPGRADE TO THE EXISTING VEEDER-ROOT PANEL 350 FOR ISD WILL BE <br />DONE UNDER A FUTURE CONTRACT. <br />ISD will not be installed at this time. <br />6. TESTING <br />PROVIDE ALL TESTING AND START UP REQUIRED BY THE EQUIPMENT MFG. <br />AND THE PERMITS ISSUED FOR THE WORK. THE FUEL SYSTEMS CONTRACTOR <br />MAY NOT BE PERFORMING ALL OF THE TESTING AND THE START UP. THIS <br />SERVICE MAY BE PERFORMED BY OTHERS WORKING DIRECTLY FOR THE <br />OWNER. <br />7. PERMITS <br />FUEL SYSTEMS CONSULTING WILL MAKE APPLICATION FOR A PERMIT FROM <br />SJVUAPCD "AIR", SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPT "HAZ" <br />AND THE FIRE DISTRICT "FIRE". <br />WE EXCLUDE PERMITS OTHER THAN THOSE DETAILED ABOVE. <br />08259scopel <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.