Laserfiche WebLink
• <br />1�i <br />COMPANY: 99 Shell <br />DATE OF QUOTATION QUOTE NUMBER <br />09/10/09 AG606-08 <br />PROJECT Miramar Enterprises <br />QUANTITY <br />DESCRIPTION <br />UNIT PRICE EXTENDED <br />DISPENSER HARDWARE: <br />8 <br />VST VSTA-EVR-012 12" Coaxial EVR Whip Hose <br />8 <br />VST VDV-EVR-096 8' Coaxial EVR Hose With Venturi <br />8 <br />VST VSTA-EVR-SBK Coaxial EVR Breakaway With Check Valve <br />8 <br />VST VST-EVR-NBBL Coaxial EVR Balance Nozzle Black <br />VEEDER ROOT Carbon Canister for PMC only <br />1 <br />VEEDER-ROOT 861290-002 Carbon Pressure Management System (Pending CARB <br />Approval) W/ 2" Installation Kit <br />1 <br />HUSKY 5885 2" Pressure Vacuum Vent (EVR Carb Approved) 3 Required <br />1 <br />VEEDER-ROOT 330020-515 ISD Manuals & Vapor Pressure Sensor -1 per site <br />1 <br />VEEDER-ROOT 332250-001 7 Input Smart Sensor Module W Embedded Pressure <br />Sensor For Vacuum Sensor Monitoring & ISD For VR Carbon Canister. Mounts in Low <br />Power Compartment. <br />1 <br />VEEDER-ROOT 331500-358 ECPU2 & Version 28 Software Upgrade W/ NVMEM2 <br />Old ECPU Board Must Be Returned within 75 Days. There is a minimum $629.00 <br />Core Charge. Core charge will be considerably higher if the current software has any <br />software enhancements on it such as CSLD, PLLD etc. <br />Veeder Root Canister/VST Hanging Hardware Terms: 25% down payment <br />required and balance due 10 days after invoice which will be upon receipt of <br />Canisters by NWP from Veeder Root. <br />Exclusions: <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover <br />the high cost of fuel. Currently Gilbarco and Gasboy have implemented fuel <br />surcharges. NWP expects many other factories to follow. NWP will have to <br />pass these charges on. Please be aware that your final bill will include any fuel <br />surcharges that NWP has to pay. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): <br />Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous <br />Pipe Fittings and Accessories, Any Electrical Consideration, Offloading or Setting Any <br />Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items (s) Not <br />Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation <br />does not include or imply any equipment or quantities other than listed herein. <br />Contractor to determine actual quantities required. No retainage to apply. <br />Performance: Performance of equipment listed is based upon the accuracy of the <br />information supplied to NW Pump and Equipment Co. by the customer or customer's <br />engineer. Guarantee of performance may require approval by a licensed engineer at <br />the customer <br />Page 2 of 2 <br />Northwest Pump Equipment Co. <br />