My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:37:30 PM
Creation date
6/23/2020 6:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504388_1605 S EL DORADO_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />1�i <br />COMPANY: 99 Shell <br />DATE OF QUOTATION QUOTE NUMBER <br />09/10/09 AG606-08 <br />PROJECT Miramar Enterprises <br />QUANTITY <br />DESCRIPTION <br />UNIT PRICE EXTENDED <br />DISPENSER HARDWARE: <br />8 <br />VST VSTA-EVR-012 12" Coaxial EVR Whip Hose <br />8 <br />VST VDV-EVR-096 8' Coaxial EVR Hose With Venturi <br />8 <br />VST VSTA-EVR-SBK Coaxial EVR Breakaway With Check Valve <br />8 <br />VST VST-EVR-NBBL Coaxial EVR Balance Nozzle Black <br />VEEDER ROOT Carbon Canister for PMC only <br />1 <br />VEEDER-ROOT 861290-002 Carbon Pressure Management System (Pending CARB <br />Approval) W/ 2" Installation Kit <br />1 <br />HUSKY 5885 2" Pressure Vacuum Vent (EVR Carb Approved) 3 Required <br />1 <br />VEEDER-ROOT 330020-515 ISD Manuals & Vapor Pressure Sensor -1 per site <br />1 <br />VEEDER-ROOT 332250-001 7 Input Smart Sensor Module W Embedded Pressure <br />Sensor For Vacuum Sensor Monitoring & ISD For VR Carbon Canister. Mounts in Low <br />Power Compartment. <br />1 <br />VEEDER-ROOT 331500-358 ECPU2 & Version 28 Software Upgrade W/ NVMEM2 <br />Old ECPU Board Must Be Returned within 75 Days. There is a minimum $629.00 <br />Core Charge. Core charge will be considerably higher if the current software has any <br />software enhancements on it such as CSLD, PLLD etc. <br />Veeder Root Canister/VST Hanging Hardware Terms: 25% down payment <br />required and balance due 10 days after invoice which will be upon receipt of <br />Canisters by NWP from Veeder Root. <br />Exclusions: <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover <br />the high cost of fuel. Currently Gilbarco and Gasboy have implemented fuel <br />surcharges. NWP expects many other factories to follow. NWP will have to <br />pass these charges on. Please be aware that your final bill will include any fuel <br />surcharges that NWP has to pay. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): <br />Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous <br />Pipe Fittings and Accessories, Any Electrical Consideration, Offloading or Setting Any <br />Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items (s) Not <br />Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation <br />does not include or imply any equipment or quantities other than listed herein. <br />Contractor to determine actual quantities required. No retainage to apply. <br />Performance: Performance of equipment listed is based upon the accuracy of the <br />information supplied to NW Pump and Equipment Co. by the customer or customer's <br />engineer. Guarantee of performance may require approval by a licensed engineer at <br />the customer <br />Page 2 of 2 <br />Northwest Pump Equipment Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.