My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_1994-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:19:59 PM
Creation date
6/23/2020 6:56:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2001
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WR=N MON70RING PROCEDURES <br />.UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all, times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-34:20 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before malting the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name <br />Facility Address 4V Aa a -e - <br />e <br />r <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank <br />C Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />Cal <br />M1 <br />19 <br />List the name(s) and title(s) of the people responsible for performing the monitorini, <br />andjor maintaining the equipment <br />ReDorting format for monitoring: <br />Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: Zge L4 2-- • - <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment:,4 =az de, ja A.S4 C., ad Zze &L- a— <br />& ze&s 9 ee 420 /fie® 2Z .& Ze=�c&✓ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.