My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_1994-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:19:59 PM
Creation date
6/23/2020 6:56:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2001
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f�o- GS C <br /> STATE OF CALIFORNIA , ,- <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B ? "= <br /> (�7 <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.s B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) _ D. TANK CAPACITY IN GALLONS: <br /> If.TANK CONTENTS IFA-1 IS MARKED.COMPLETE ITEM C. <br /> I REGULAR <br /> A 1 MOTOR VEHICLE FUEL (❑ 4 OIL B. C. ❑ 1aUNLEADED 3 DIESEL ❑ 6 AVIATION GAS <br /> 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ lb PREMIUM 4 JET ET FUEL ❑ 7 METHANOL <br /> UNLEADED 5 FUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(AA)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.s: <br /> Ill. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A- TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL � 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> 1 RU88ER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS <br /> LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO <br /> D.CORROSION J 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAM_Lqqff OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF A13OVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION U PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> 8. CONSTRUCTION A U t SINGLE WALL A CU DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A� FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WICOATING A U 8 100%METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTKNI A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION gl 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3 MONRORING [:]99 OTHER <br /> V.TANK LEAK DETECTION <br /> F <br /> ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN C 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED d SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW I . Ill,I q,- <br /> COUNTY# JURISDICTION# FACILITY# TANK# ( <br /> STATE I.D. ! I ;zo <br /> ,7 <br /> PERMIT NUMBER ` PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE 1 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH TV-I.00AL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> :ORM 8 (12-91) 0 <br /> _ F OM4&R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.