Laserfiche WebLink
ryu�"ens <br /> STATEOFCAUFORNIA • ��"' `,; <br /> STATE WATER RESOURCES CONTROL BOARD W a <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B <br /> 0 <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY j❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLQ <br /> ONE ITEM F❑ 2 INTERIM PERMIT ❑ a AMENDED PERMIT �4 6 TEMPORARY TANK CLOSURE ❑ a TANK REMOVEQY <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS—SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.0.s B. MANUFACTURED BY: y, <br /> C. DATE INSTALLED(MC/OAY/YEAR) I D. TANK CAPACITY IN GALLONS: <br /> 11.TANK CONTENTS IFA.I IS MARKED.COMPLETEITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C• ❑ 1aREGULAR UNLEA EO 3 DIESEL ❑ 6 AVIATION GAS <br /> 2 PETROLEUM ❑ 80 EMPTY : 1 PRODUCT ❑ ib PREMIUM a GASAHOL ❑ 7 METHANOL <br /> UNLEADED 5 JETFUEL <br /> 3 CHEMICAL PROOUC7 ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> 0. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.s: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX 0 AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> J 1 BARE STEEL ❑ 2 STAINLESS STEEL j� <br /> B. TANK ^ <br /> 3 FIBERGLASS u a STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> s^" <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> LINING 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR)� OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTHIFAPPUCA13LE <br /> A. SYSTEM TYPE A U 1 SUCTION A `2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A(7�2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3 MONROFi81C Cl gg OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECRNC 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNO WATER MONITORING <br /> 6 TANK TESTING T <br /> 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNA) 2.ESTIMATED QUANTITY OFI 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, 1S TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# (0(olx - <br /> STATE I.D. sJ n ! 3'T�. I�10� <br /> PERMIT NUMBER I PERMIT APPROVED BY/DATE I PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WffN" OCAL AGENCY IMPLEMENTING THE UNDERGROUND Sr' 1E TANK REGULATK)NS <br /> PORMB (12.91) • F0R04146-96 <br />