Laserfiche WebLink
NEW U11L INSTALLATION INSPECTION )RD <br /> FACILITY NAME: ADDRESS; <br /> SWEEPS# TANKU: ULS TANK MODEL/MATERIAL: <br /> CAPACITY; PRODUCT: R.E_H_St <br /> A I <br /> P NALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE 9 <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1_ UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 CE) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: 4 HRS/MIN: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI} <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (8) (4)) <br /> 7_ SECONDARY PIPING CONTAINMENT TEST PSI: HRS/NIN: OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL STUMPS (24 HR. MINIMUM) NRS: (CCR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> s 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF COiTINUOIS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LIME LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT—OFF (CCR 2635 (B) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (8) (6)) <br /> 17. OVERFILL PROTECTION INSTALLEDIAPPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23_ ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F}) <br /> COMMENTS: <br /> EH23-006 3/92 (REVISED 11\92) <br /> 8 <br />